A crew of six have been back at Cheticamp working on the grid shell. You have to look closely. The laths are now in a much more regular pattern, the gable ends improved, and all is closer to the ideal structural model on the computer. We have surveyed and located all the nodes and are comparing the as-builts to the computer model. Next step is installing continuous shear blocking between the laths along the main stress lines of the shell.